Service Process
Service Process
Design phase process
1
5 days
Initial contact
Preliminary Communication
Understand the situation of the case and the surrounding environment, needs, style, and budget.
The owner provides CAD files or simple measurement of old houses
Basic company introduction
Basic company introduction
2
Plane drawing discussion
Planar Configuring communication
Discuss the floor plan according to the requirements.
Proposal for floor plan
Flat configuration concept discussion
Introduction of works over the years
Flat configuration concept discussion
Introduction of works over the years
3
3 Days
Design contract
Design contract
A preliminary consensus was reached and the two parties signed a design contract.
Design contract in duplicate
Discussion and finalization of plane configuration
Design fee 8000/floor (the actual design number of pings)
Discussion and finalization of plane configuration
Design fee 8000/floor (the actual design number of pings)
4
14 Days
On-site measurement
Field Measurement
Accurate measurement on the actual site.
Accurate measurement on the actual site
Demolition of the original decoration according to the situation
Design drawing schedule
Demolition of the original decoration according to the situation
Design drawing schedule
5
7 Days
Graphic communication
Figure communication
Discuss the space planning and configuration of the drawing.
3D schematic sketch model simulation (only public area)
Plane system drawing
Façade drawing frame grows into
Plane system drawing
Façade drawing frame grows into
6
14 Days
Detailed discussion
Discussion of Details
Draw a complete construction drawing.
3D schematic rendering modification (public area only)
Modification of the floor plan
Elevation plan storage discussion
Material selection recommendations
Modification of the floor plan
Elevation plan storage discussion
Material selection recommendations
7
7 Days
Finalized draft
Finished
Draw a complete construction drawing.
Complete draft of the plan system drawing
Finished façade drawing
Material selection correction
Project Budget Quotation
Finished façade drawing
Material selection correction
Project Budget Quotation
Engineering stage process
※The number of days is estimated based on actual working days
1
Engineering Quotation
Engineering quotes
Detailed construction items and unit price
Project Budget Quotation
Project schedule
Project management fee 10%
Purchase fee 5%
Project schedule
Project management fee 10%
Purchase fee 5%
2
Engineering contract
Design contract
Both parties sign a project contract
Engineering contract in duplicate
3
Material confirmation
Material confirmation
Confirm the selection of detailed materials and grasp the quality of the materials.
Engineering outsourcing
4
Approach construction
Engineer Construction
Professional and rigorous construction
Construction shooting archive
5
Preliminary acceptance
Contract Closing
According to the construction schedule, the owner will be asked for acceptance.
Initial inspection after completion
6
Completion acceptance
Contract Closing
Upon completion, please check and accept by the owner.
Fix the problem and hand over the house
Refund of the building decoration deposit
Delivery of keys and equipment guarantee
Delivery and construction process photos
Completion drawing of delivery
Refund of the building decoration deposit
Delivery of keys and equipment guarantee
Delivery and construction process photos
Completion drawing of delivery
7
After-sales service
After Sales Service
Provide one-year construction quality warranty and permanent after-sales service.
Touch up the furniture after entering the field